31. Six men can do a piece of work in 8 hours.

How long will it take four men to complete the
same work?
A. 12hrs
B. 48hrs
C. 6hrs
D. 4hrs​

User Zocoi
by
8.2k points

1 Answer

2 votes

Answer:

I think the answer is A. I hope that is right

6×8= 48

4×12=48