An engineer is designing a new bridge that will support more cars. Segment CF is held in place with a series of cables and represents the perpendicular

bisector of the base of the bridge AB. If the lengths of two of the four support cables are given, what is the total length of cables, in meters, required for
the construction team to follow through with the engineer's plans for a new bridge?
Select one:
A.962
B.1128
C. 192.4
D. 2322

An engineer is designing a new bridge that will support more cars. Segment CF is held-example-1

1 Answer

7 votes

Answer:

c. 192.4

Explanation:

User Spolto
by