Given:
Eddie takes 2 hours to shovel.
Brad takes 5 hors to shovel.
To Find:
The amount of time needed if both of time work together.
Solution:
Eddie takes 2 hours to shovel.
1 hour = 1/2 of the work
Brad takes 5 hors to shovel.
1 hour = 1/5 of the work
If they work together:
1 hour = 1/2 + 1/5
1 hour = 7/10 of the work
Find the number of hours needed:
Number of hours needed = 10/7
Number of hours needed = 1.43 hours
Answer: It takes about 1.43 hours if they shovel together.