Answer:
2.6
Step-by-step explanation:
I am assuming that for any given program, that 70% of it's executed instructions happen to be arithmetic, another 10% happen to be load/store, and finally, a 20% happen to be branch. If so, then I can say
Average CPI =
3Σi=1 Percentage of instructions * CPI
Average CPI = (0.7 * 2) + (0.1 * 6) + (0.2 * 3)
Average CPI = 1.4 + 0.6 + 0.6
Average CPI = 2.6