Given :
Work done by a segment dx of a cable :
dW = 8dx x = 8x dx
So, work done by whole cable :
Now, work done to bring coal up :
Therefore, total work done is ( 810000 + 405000 ) = 1215000 ft-lb .
Hence, this is the required solution.
9.5m questions
12.2m answers