Overhead can be applied to products using one of three different methods: single plantwide rate, multiple production department rates, and activity-based costing. True False

User Abdillah
by
6.2k points

1 Answer

6 votes

Answer:

True

Step-by-step explanation:

The above is true because single plant wide rate, multiple production department costs and activity based costing are the only methods of overhead costs allocation.

The plant wide rate uses the predetermined overhead rates in the allocation of overhead cost.