Subway, the sandwich shop, is run by Jim, Tim and Kim. When a customer arrives, Jim spends 5 minutes taking order from the customer. After this, Tim prepares bread and Kim prepares filling for the order. These activities are performed in parallel, and take 7 and 10 minutes respectively. Jim then assembles the bread and filling, which takes 5 minutes of his time. Finally, Tim spends 5 minutes in delivering the order and taking payment. What is the minimum time for an order to be completed in the process

User Millebii
by
6.1k points

2 Answers

5 votes

Final answer:

The minimum time for an order to be completed at Subway given the tasks completed by Jim, Tim, and Kim is 25 minutes. This includes the longest task performed in parallel and the serial tasks.

Step-by-step explanation:

To calculate the minimum time for an order to be completed at the sandwich shop run by Jim, Tim, and Kim, we need to consider the tasks that are performed in series and parallel. Jim's initial order-taking and final assembling are serial tasks, each taking 5 minutes.

Tim's bread preparation and Kim's filling preparation occur in parallel. Since these parallel tasks take 7 and 10 minutes respectively, we consider the longer duration, which is 10 minutes. Finally, Tim's delivery and payment are another serial task that takes 5 minutes.

  • Jim takes the order: 5 minutes
  • Tim prepares bread: 7 minutes (parallel)
  • Kim prepares filling: 10 minutes (parallel)
  • Jim assembles sandwich: 5 minutes
  • Tim delivers order and takes payment: 5 minutes

Adding the longest parallel task (10 minutes) to the serial tasks (5 + 5 + 5 minutes), the total minimum time for an order to be completed is 25 minutes.

User Ninad Kambli
by
6.0k points
3 votes

Answer:

22 minutes minimum time

Step-by-step explanation:

In the given scenario Subway sandwich shop has given its processes and time of each process.

We are to calculate the minimum time it will take to process a order. So we add all the times

Below is breakdown of the process time

Jim take orders 5 minutes

Tim prepares bread and Kim prepares filling for the order 7 - 10 minutes. We use 7 minutes since we are looking for minimum time.

Jim then assembles the bread 5 minutes

Time delivers order and takes payment 5 minutes

Total time = 5 + 7 + 5 + 5 = 22 minuites