Final answer:
The plantwide predetermined overhead rate for Taveras Corporation is $20 per machine-hour. Job P90's total cost, including direct materials, direct labor, and overhead, is $4,900.
Step-by-step explanation:
Calculation of Plantwide Predetermined Overhead Rate
The plantwide predetermined overhead rate is calculated by dividing the total estimated manufacturing overhead costs, both fixed and variable, by the estimated number of machine-hours. The total manufacturing overhead is the sum of the fixed costs and the total variable costs (variable cost per machine-hour multiplied by the estimated machine-hours). By using the provided estimates, we have:
Total Manufacturing Overhead Cost = Fixed Cost + (Variable Cost per Machine-Hour × Estimated Machine-Hours)
Total Manufacturing Overhead Cost = $4,320,000 + ($2.00 × 240,000)
Total Manufacturing Overhead Cost = $4,320,000 + $480,000
Total Manufacturing Overhead Cost = $4,800,000
Now we divide this total by the estimated machine-hours to get the predetermined overhead rate:
Plantwide Predetermined Overhead Rate = Total Manufacturing Overhead Cost / Estimated Machine-Hours
Plantwide Predetermined Overhead Rate = $4,800,000 / 240,000 Machine-Hours
Plantwide Predetermined Overhead Rate = $20 per Machine-Hour
Determination of Total Cost for Job P90
To determine the total cost of Job P90, we add the direct materials, direct labor, and applied manufacturing overhead based on the predetermined overhead rate and machine-hours used by Job P90.
Total Job Cost = Direct Materials + Direct Labor + (Predetermined Overhead Rate × Machine-Hours Used)
Total Job Cost = $1,840 + $1,320 + ($20 × 87)
Total Job Cost = $1,840 + $1,320 + $1,740
Total Job Cost = $4,900
The total cost of Job P90 is therefore $4,900.