Answer:
$178
$259
Explanation:
The calculation of the variable costing concept and (b) the absorption costing concept is shown below:-
Cost of Goods Manufactured per unit = $516,200 ÷ 2,900
= $178
Fixed Manufacturing Overhead Per Unit = $234,900 ÷ 2,900
= $81
Variable Product cost Per Unit = Cost of Goods Manufactured per Unit
= $178
Absorption product cost per unit = $178 + $81
= $259