Parker Company uses a job-order costing system and applies manufacturing overhead to jobs using a predetermined overhead rate based on direct labor-hours. Last year manufacturing overhead and direct labor-hours were estimated at $50,000 and 20,000 hours, respectively, for the year. In June, Job #461 was completed. Materials costs on the job totaled $4,000 and labor costs totaled $1,500 at $5 per hour. At the end of the year, it was determined that the company worked 24,000 direct labor-hours for the year and incurred $54,000 in actual manufacturing overhead costs. Required: a. Job #461 contained 100 units. Determine the unit product cost that would appear on the job cost sheet. b. Determine the underapplied or overapplied overhead for the year.

User Brianb
by
6.4k points

1 Answer

6 votes

Answer:

Instructions are below.

Step-by-step explanation:

First, we need to calculate the predetermined overhead rate:

Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base

Predetermined manufacturing overhead rate= (50,000/20,000)

Predetermined manufacturing overhead rate= $2.5 per direct labor hour

Now, we can determine the total cost and unitary cost of Job 461:

Direct labor hours= 1,500/5= 300

Total cost= 4,000 + 1,500 + 2.5*300= $6,250

Unitary cost= 6,250/100= $62.5

To calculate the under/over allocation, first, we allocate overhead for the whole company:

Allocated MOH= Estimated manufacturing overhead rate* Actual amount of allocation base

Allocated MOH= 2.5*24,000= $60,000

Under/over applied overhead= real overhead - allocated overhead

Under/over applied overhead= 54,000 - 60,000

Under/over applied overhead= $6,000 overallocated