Answer:
1. B $55.55
2.
Step-by-step explanation:
1. The overhead cost per unit of product A under the traditional costing system
Overhead cost per unit = Estimated manufacturing overhead / Direct labor hours
= $63,332 / (570 × 0.5)
= $55.55 per unit
2. Activity rate