Answer:
Thermal collection system
Step-by-step explanation:
In practise, the CSP is not so different from other types of infrastructure schemes, such as schemes for the construction of traditional fossil-fuel power stations, photovoltaic ( PV), wind or hydroelectric power plants, or real estate projects. A pre-feasibility study for a preselected location would be conducted in an perfect world and available knowledge would be obtained..