Answer:
Explanation:
Original question is attached
Option 1
- C(x) = 25x + 50
- C(8) = 25*8 + 50 = $250
Option 2
- As per table, the rate of change is $30 per 2 hours.
- So 8 hours will cost
- $190 + $30 = $220
As we see the second option is cheaper so we should hire the Master Remodeling