Answer:
Total Overhead cost = $529,552
Step-by-step explanation:
Product P4 Expected cost Expected Activity Activity Rate
Labor-related 117,100 7,200 16.26
Production orders 55,210 900 61.34
Order size 863,520 6,500 132.85
The total overhead applied to Product P4 under activity-based costing will be derived by Total of various (Activity Rate * Activity incurred)
Product P4 Activity Rate Activity Incurred Overhead assigned
Labor-related 16.26 2,400 39024
Production orders 61.34 200 12268
Order size 132.85 3,600 478260
Total Overhead cost $529,552