Answer:
Direct cost= $63,000
Indirect cost= $123,900
Step-by-step explanation:
Giving the following information:
Direct materials $ 5.40
Direct labor $ 3.60
Variable manufacturing overhead $1.70
Fixed manufacturing overhead $112,000
The overhead component of production is an indirect cost.
Direct cost= (5.4 + 3.6)*7,000= $63,000
Indirect cost= (1.7*7,000) + 112,000= $123,900