Answer and Explanation:
1. The computation of the predetermined overhead rate is shown below:
= Overhead applied ÷ direct material cost
= $846,000 ÷ $1,800,000
= 47%
2. The direct labor and overhead cost assigned to the job is shown below:
Total cost $89,000
Less: direct material cost $32,000
Less: overhead cost $15,040 ($32,000 × 0.47)
Direct labor cost $41,960