Careful, detailed planning and much paperwork enabled the Empire State Building to be put up in record time.

A progress chart and a printed timetable were issued daily. These specified everything to be done that day, identifying each truck that would drive right in onto the first floor, what it would be delivering, and who was responsible to receive it and to use the materials it carried. Each steel piece was numbered to see that it went to the proper derrick and to indicate its proper place in the building.

—The Building of Manhattan,
Donald A. Mackay


How would i paraphrases this?

User Tony Chen
by
5.0k points

2 Answers

6 votes

Answer:Thinking ahead allowed builders to construct the Empire State Building very quickly. Every day, workers were given instructions that showed what had to be done and where each delivery needed to go. Individual materials were marked to make sure they went to the right place in the building.

Step-by-step explanation:

(Sample respons)

User Giantriant
by
4.7k points
4 votes

Answer:

Step-by-step explanation:

An advancement outline and a printed schedule were given every day. These predefined everything to be done that day, recognizing each truck that would drive directly in onto the principal floor, what it would convey, and who was capable to get it and to utilize the materials it conveyed. Each steel piece was numbered to see that it went to the best possible derrick and to show its legitimate spot in the structure.

Here you go! Hope this helped.