Step-by-step explanation:
An advancement outline and a printed schedule were given every day. These predefined everything to be done that day, recognizing each truck that would drive directly in onto the principal floor, what it would convey, and who was capable to get it and to utilize the materials it conveyed. Each steel piece was numbered to see that it went to the best possible derrick and to show its legitimate spot in the structure.