menu
Qammunity.org
Login
Register
My account
Edit my Profile
Private messages
My favorites
3. What group is responsible for creating the product features that meet customer's needs and wants? A. Manufacturing B. Product design C. Quality D. Engineering
Ask a Question
Questions
Unanswered
Tags
Categories
Ask a Question
3. What group is responsible for creating the product features that meet customer's needs and wants? A. Manufacturing B. Product design C. Quality D. Engineering
asked
Nov 12, 2021
16.7k
views
3
votes
3. What group is responsible for creating the product features that meet customer's needs and wants? A. Manufacturing B. Product design C. Quality D. Engineering
Engineering
college
Quake
asked
by
Quake
8.2k
points
answer
comment
share this
share
0 Comments
Please
log in
or
register
to add a comment.
Please
log in
or
register
to answer this question.
1
Answer
2
votes
Answer:
Step-by-step explanation:
i think it's B
HussienK
answered
Nov 19, 2021
by
HussienK
8.0k
points
ask related question
comment
share this
0 Comments
Please
log in
or
register
to add a comment.
← Prev Question
Next Question →
No related questions found
Ask a Question
Welcome to QAmmunity.org, where you can ask questions and receive answers from other members of our community.
9.4m
questions
12.2m
answers
Other Questions
A piston-cylinder device fitted with stops in the cylinder walls contains 2.1 kg of water initially at 150 kPa and 30 °C. Heat is transferred to the system until the final temperature reaches 250 °C. The
An activated sludge plant is being designed to handle a feed rate of 0.438 m3 /sec. The influent BOD concentration is 150 mg/L and the cell concentration (MLVSS) is 2,200 mg/L. If you wish to operate the
The bulk modulus of a fluid if it undergoes a 1% change in volume when subjected to a pressure change of 10,000 psi is (a) 0.01 psi (b) 0.001 psi (c) 0.00001 psi (d) 0.000001 psi (e) none of these
A car has an initial speed of 10 m/s. It then undergoes a constant acceleration of 0.05 m/s^2 over a distance of 5 km. Determine: a) The car final speed. b) The time needed to travel the 5 km.
Where are all the controls on most circuits?
Twitter
WhatsApp
Facebook
Reddit
LinkedIn
Email
Link Copied!
Copy
Search Qammunity.org