Answer:
Built it with proper research and study and give it to capable parties to collect fund and construct. Give it directly to the Indian companiesBuilt it with capital of Nepali people. If minister Kamal Thapa was serious about number 3 then obviously it is going to benefit Nepali in long term.
it's advantages
Budhiganga Hydropower Project aims at contributing to the social and economic development of Nepal through increasing electricity generation capacity of the country which will help to meet the load demand and reduce the load shedding by developing the Budhi Ganga Hydroelectric Power Project.