Answer:
Total cost= $7,464
Step-by-step explanation:
Giving the following information:
Job 450:
Direct materials= $2,049
35 direct labor-hours
195 machine-hours
The direct labor wage rate is $21 per labor-hour.
The predetermined overhead rate is $24 per machine-hour.
The total cost is calculated using the following formula:
Total cost= direct material + direct labor + allocated overhead
Total cost= 2,049 + 35*21 + 195*24
Total cost= 2,049 + 735 + 4,680
Total cost= $7,464