14.9k views
1 vote
set up and solve an equation for the following scenario in a food processing facility there is a large vat that must be filled halfway with water which is 72 inches the vat fills up with water at 0.2 inches per minute if the water is already at 9 inches how long will it take until the vat reaches halfway

User Zeruno
by
5.3k points

1 Answer

2 votes

it will take 314 minutes ro fill the vat halfway

User Holmesal
by
6.8k points