16.4k views
4 votes
You have a machine that is staffed 8 hours per day. The average throughput rate is 28 batches per day, and the setup time is 5 minutes per batch. The plant operates 16 hours per day but the machine is staffed for 8 hours. Calculate:a. Average processing time per unitb. MTT per unit

1 Answer

3 votes

Answer:

The average processing time per unit = 1.46 minutes per unit

MTT per unit 0.25 minutes per unit

Step-by-step explanation:

Given that:

number of hours per day for a machine = 8 hours per day

The average throughput rate = 28 batches per day

the setup time = 5 minutes per batch

Plant operating hours = 16 hours per day

To calculate:

a. Average processing time per units is determined by evaluating the average processing time per batch.

Using the following formula:

Average processing time per units = Total available time ÷ batches per day

where;

Total available time = Operating time per day - batches setup time

Total available time = (16 × 60 )minutes - (28 batches × 5 minutes)

= 960 - 140 = 820 minutes per day

Average processing time per batch = 820 minutes ÷ 28 batches = 29.29

NOW, Average processing time per units = Average processing time per batch ÷ batch size

= 29.29 ÷ 20 = 1.46 minutes per unit

b) MTT per unit

The MTT per unit can be computed by using the formula

MTT per unit = Setup time ÷ batch size

MTT per unit = 5 minutes ÷ 20 minutes

MTT per unit = 0.25 minutes per unit

User Mgyongyosi
by
4.5k points