Answer:
The meaning of the cumulative EAC ( cell M105 ) at the conclusion of period 6 is the total accumulation of the cost inquired within the period expressed as a percentage of the cost of completed tasks to the accumulating costs set aside for the entirety of the task.
Step-by-step explanation:
The meaning of the cumulative EAC ( cell M105 ) at the conclusion of period 6 is the total accumulation of the cost inquired within the period expressed as a percentage of the cost of completed tasks to the accumulating costs set aside for the entirety of the task.
EAC ( estimate at completion ) is the estimation of the cost of the final cost of a project,and it is estimated based on the performance of the project at completion