Answer: Probability = 0.2
Explanation:
Given data:
Mean production time = 32.20 seconds
Standard deviation = 1,05seconds
probability that a full production run will take less than 32 seconds on average to produce
= P(Xbar<32)
= P(Z<-0.8518)
= 0.2