Answer:
$6 per machine hour
Step-by-step explanation:
Predetermined overhead rate=Estimated total overhead/Estimated machine hours
Predetermined overhead rate = $1,200,000 / 200,000 hours
Predetermined overhead rate = $6 per machine hour.
Thus, the predetermined overhead rate is $6 per machine hour