llinois​ Furniture, Inc., produces all types of office furniture. The​ "Executive Secretary" is a chair that has been designed using ergonomics to provide comfort during long work hours. The chair sells for​ $130. There are 480 minutes available during the​ day, and the average daily demand has been 48 chairs. There are eight​ tasks:

User Wilfo
by
4.7k points

1 Answer

1 vote

Answer:

The tasks A and B will be performed together, then C, D and E will be performed one by one and then F and G will be performed to enable the final task H which will be performed last.

Total task time is 49 mins

= 4 + 7 + 6 + 5 + 6 + 7 + 8 + 6

=49 mins.

Cycle time is 10 min per chair

Production time available per day divided by units required per day

480 minutes / 50 chairs

= 10 mins per chair.

Minimum number of workstation

49 mins / 10 mins = 5 workstations

Step-by-step explanation:

The tasks A and B will be performed together, then C, D and E will be performed one by one and then F and G will be performed to enable the final task H which will be performed last.

Total task time is 49 mins

= 4 + 7 + 6 + 5 + 6 + 7 + 8 + 6

=49 mins.

Cycle time is 10 min per chair

Production time available per day divided by units required per day

480 minutes / 50 chairs

= 10 mins per chair.

Minimum number of workstation

49 mins / 10 mins = 5 workstations