Answer:
You are missing the requirements. I looked them up and found the following:
Determine the direct materials price variance, direct materials quantity variance, and total direct materials cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
Standard Costs Actual Costs
Direct materials 185,000 lbs. at $6.00 183,200 lbs. at $5.80
Direct labor 18,500 hrs. at $16.50 18,930 hrs. at $16.90
Factory overhead Rates per direct labor hr., based on 100% of normal capacity of 19,310 direct labor hrs.:
Variable cost, $3.10 $56,780
variable cost Fixed cost, $4.90 $94,619 fixed cost
Each unit requires 0.25 hours of direct labor
direct materials price variance = AQ x (AP - SP) = 183,200 x ($5.80 - $6) = -$36,640 favorable variance
direct materials quantity variance = SP x (AQ - SQ) = $6 x (183,200 - 185,000) = -$10,800 favorable variance
total direct materials cost variance = (AQ X AP) - (SQ X SP) = (183,200 X $5.80) - (185,000 X $6) = $1,062,560 - $1,110,000 = -$47,440 favorable variance
or
total direct materials cost variance = direct materials price variance + direct materials quantity variance = -$36,640 - $10,800 = -$47,440 favorable variance