Answer:
4.2 kanban containers required
Explanation:
Given the following information :
Waiting time = 0.25 days
Average peocessing time = 0.15 days / container
Daily usage (Demand rate) = 2000 per day
Container capacity = 200 wheels
Policy variable ( Alpha) = 5% = 0.05
Therefore, number of kanban containers needed for the wheels can be calculated using:
(Number of containers(x) * container size) = (Demand rate (waiting time + processing time)*(1 + alpha))
x * 200 = 2000(0.25 + 0.15)*(1 + 0.05)
200x = 2000(0.40)*(1.05)
200x = 840
x = 840 / 200
x = 4.2
4.2 kanban containers required