Answer:
Instructions are below.
Step-by-step explanation:
Giving the following information:
Estimated factory overhead:
fabrication, $448,000
assembly, $180,000
setup, $222,600
inspection, $189,000
Fabrication Assembly Setup Inspection
Speedboat 7,000 dlh 22,500 dlh 50 setups 88 inspections
Bass boat 21,000 7,500 370 612
28,000 dlh 30,000 dlh 420 setups 700 inspections
Each product is budgeted for 5,000 units of production for the year.
First, we need to calculate the predetermined overhead rate for each activity using the following formula:
Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
fabrication= 448,000/28,000= $16 per direct labor hour
assembly= 180,000/30,000= $6 per direct labor hour
setup= 222,600/420= $530 per setup
inspection= 189,000/700= $270 per inspection
Now, we can allocate overhead to each product line:
Allocated MOH= Estimated manufacturing overhead rate* Actual amount of allocation base
Speed boat:
Allocated MOH= 7,000*16 + 22,500*6 + 50*530 + 88*270= $297,260
Bass boat:
Allocated MOH= 21,000*16 + 7,500*6 + 370*530 + 612*270= $742,340
Finally, the unitary overhead cost:
Speed boat= 297,260/5,000= $59.45
Bass boat= 742,340/5,000= $148.47