Answer:
25 students
Explanation:
What we need to do here is to do some tracing. We simply need to go to the point on the concert band where we have the value 35.
After sighting this value, we then make a tracing to the line of best fit. Then from this line of best fit, we trace the point on the matching band that correlated with the value 35.
If properly traced, we would arrive at a value of 25 on the marching band