Answer:
The correct answer is A.
Step-by-step explanation:
Giving the following information:
Cost Pool Overhead Costs Activity-cost driver
Setups: $238,160 - 45,800 setups
To calculate the predetermined manufacturing overhead rate we need to use the following formula:
Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Setup= 238,160/45,800= $5.2 per setup