Answer:
The lower quartile is on the lower end of the box plot, and the upper quartile is on the upper part of the box plot.
To determine lower quartile:
- Use the formula (N + 1) × 1/4
To determine upper quartile:
- Use the formula (N + 1) × 3/4
Hope this helps! :)