ompute the plantwide predetermined overhead rate. 2. During the year, Job 400 was started and completed. The following information was available with respect to this job: Direct materials $ 320 Direct labor cost $ 240 Machine-hours used 36 Compute the total manufacturing cost assigned to Job 400. 3. If Job 400 includes 50 units, what is the unit product cost for this job? 4. If Moody uses a markup percentage of 120% of its total manufacturing cost, then what selling price per unit would it have established for Job 400?

User Knase
by
4.3k points

1 Answer

4 votes

Answer:

Instructions are below.

Step-by-step explanation:

Giving the following information:

1. We weren't provided with enough information to calculate the plantwide predetermined overhead rate. But, I can provide the information required as an example and the formulas necessary.

Estimated overhead= 1,200,000

Estimated machine-hours= 350,000

Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base

Predetermined manufacturing overhead rate= 1,200,000/350,000

Predetermined manufacturing overhead rate= $3.43 per machine hours.

2. Job 400:

Direct materials $320

Direct labor cost $240

Machine-hours used 36

Total manufacturing cost= 320 + 240 + 36*3.43

Total manufacturing cost= $683.48

3. Job 400= 50 units

Unitary cost= 683.48/50= $13.67

4. Moody uses a markup percentage of 120% of its total manufacturing cost

Selling price per unit= 13.67*1.2= $16.404