Each of the following are types of__________allocation methods:

plantwide rate method, departmental overhead rate method and activity-based costing method.

1 Answer

1 vote

Answer:

Each of the following are types of Overheads allocation methods.

Step-by-step explanation:

Factory overheads such as rent, electricity or water can not be traced directly to a cost object.

When determining the cost of a cost object these overheads are apportioned to departments they pass through for processing or the actual job using an allocation method.

The common methods for allocating overheads are plant-wide rate method, departmental overhead rate method and activity-based costing method.