Answer:
Predetermined manufacturing overhead rate= $31.14 per machine-hour
Step-by-step explanation:
Giving the following information:
Estimated machine-hour= 35,900 machine-hours
Estimated variable overhead= $4.80 per machine-hour
Total fixed manufacturing overhead was $945,606.
To calculate the predetermined manufacturing overhead rate we need to use the following formula:
Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Predetermined manufacturing overhead rate= (945,606/35,900) + 4.8
Predetermined manufacturing overhead rate= $31.14 per machine-hour