Answer:
The equation would be L = 2d + 52
Solution:
when d = 31 days
L = 2(31) + 52
L = 62 + 52
L = 114 miles
The total length of the road after the crew has worked 31 days is 114 miles.
111 miles
Explanation:
L(D) = 15 miles + (3 miles/day)*D
After 32 days the total length of the finished road would be:
L(32) = 15 miles + (3 miles/day)*(32 days) = 111 miles
4.7m questions
6.0m answers