In a shipping yard, a crane operator attaches a cable to a 1,180 kg shipping container and then uses the crane to lift the container vertically at a constant velocity for a distance of 34 m. Determine the amount of work done (in J) by each of the following.

a) the tension in the cable.b) the force of gravity.

User Ajay Ahuja
by
7.9k points

1 Answer

1 vote

Answer:

Work done by the cable= 393176Joules

While work done by force of gravity is =-393176J

Step-by-step explanation:

See attached file for calculation