102k views
0 votes
Peeker Industries is analyzing an average-risk project, and the following data have been developed. Unit sales will be constant, but the sales price should increase with inflation. Fixed costs will also be constant, but variable costs should rise with inflation. The project should last for 3 years, it will be depreciated on a straight-line basis, and there will be no salvage value. No change in net operating working capital would be required. This is just one of many projects for the firm, so any losses on this project can be used to offset Page 2 of 3 gains on other firm projects. The marketing manager does not think it is necessary to adjust for inflation since both the sales price and the variable costs will rise at the same rate, but the CFO thinks an inflation adjustment is required. What is the difference in the expected NPV if the inflation adjustment is made versus if it is not made? WACC 10.0% Net investment cost (depreciable basis) $200,000 Units sold 50,000 Average price per unit, Year 1 $25.00 Fixed oper. costs excl. depreciation (constant) $150,000 Variable oper. cost/unit, Year 1 $20.20 Annual depreciation rate 33.333% Expected inflation 4.00% Tax rate 40.0%

User Zohar Levi
by
3.5k points

1 Answer

6 votes

Answer:

Step-by-step explanation:

can you please help me please

User Tony Barsotti
by
3.5k points