Answer:
The correct answer is option (A) $42.00
Step-by-step explanation:
Solution
Given that:
The established rate is given as = 100,000/40,000
= $2.5 per hour
Thus
The cost of the job is shown is shown below:
The direct material = $5,000
The direct labor = $2400
Then
The manufacturing overheard is = 400 * 2.5 = $1,000
So,
The total cost is = $5,000 + $2400 + $1000 = $8,400
To get our unit cost,
Unit cost = $8400/200 = $42.00
It is important to know that, the number of labor hours used in jobs = Total labor cost/Rate per hour
=2,400/6 = 400 hours