Answer:
$179,950
Step-by-step explanation:
For determining the overhead applied first we have to find the predetermined overhead rate based on the estimated cost which is shown below:
Predetermined overhead rate is
= Estimated overhead cost ÷ estimated direct labor cost
= $174,000 ÷ $87,000
= $2
Now the applied overhead is
= Predetermined overhead rate × actual direct labor cost
= $2 × $89,975
= $179,950
We simply applied the above formula so that the overhead applied could come