Answer:
Step-by-step explanation:
vertical component of the velocity of arrow
= 26 sin 60 = 22.516 m
height reached by it after 3.99 s
h = ut - 1/2 g t²
= 22.516 x 3.99 - .5 x 9.8 x 3.99²
= 89.83 - 78
11.83 m
Total height of cliff = 1.55 + 11.83
= 13.38 m
c ) maximum height covered s
v² = u² - 2gs
0 = u² - 2gs
s = u² / 2g
= 22.516² / 2 x 9.8
= 25.86
maximum height reached
= 25.86 + 1.55
= 27.41 m
d )
vertical speed after 3.99 s
v = u - gt
= 22.516 - 9.8 x 3.99
= -16.586
Horizontal component will remain unchanged
Horizontal component = 26 cos 60
= 13 m /s
Resultant of two velocities
= √ 13²+ 16.568²
= 21 m /s