Answer:
349 J
Step-by-step explanation:
Length L of baton = 1.0 m
Mass m of baton = 1.2 kg
Weight W of baton = 1.2 kg x 9.81 m/
= 11.772 N
Height h reached = 5.0 m
Angular speed ω = 3.5 rev/s = 2π x 3.5 (rad/s) = 21.99 rad/s
Total work done on baton will be the work done in taking it to a height of 5.0 m and the kinetic energy with which the baton rolls.
Work done to bringing it to the height of 5.0 m = weight x height above ground
W x h = 11.772 x 5 = 58.86 J
Velocity v of spinning baton = ω x L = 21.99 x 1 = 21.99 m/s
Kinetic energy =
m
=
Total work done on baton = 58.86 + 290.14 = 349 J