Answer:
The total length of the tunnel when the crew has finished digging is 1078 meters
Explanation:
total length of the tunnel dug by the crew = 573 meters
let the halfway point of the tunnel = h
if the crew digs 34 meters past the halfway point, then we will this equation below;
h + 34 meters = 573 meters
h = 573 - 34
h = 539 meters
halfway point of the tunnel is 539 meters
Then, the total length of the tunnel when the crew has finished digging = 2h
= 2 x 539 meters
= 1078 meters
Therefore, the total length of the tunnel when the crew has finished digging is 1078 meters