At the end of April, Cavy Company had completed Job 766 and 765. According to the individual job cost sheets the information is as follows:

Job

Direct Materials

Direct Labor

Machine Hours

Job 765

$5,670

$3,500

27

Job 766

$8,900

$4,775

44

Job 765 produced 152 units, and Job 766 consisted of 250 units.

Assuming that the predetermined overhead rate is applied by using machine hours at a rate of $200 per hour, determine the (a) balance on the job cost sheets for each job, and (b) the cost per unit at the end of April.

User Kurt McKee
by
5.0k points

1 Answer

2 votes

Answer:

Instructions are below.

Step-by-step explanation:

Giving the following information:

Job 765:

Direct material= $5,670

Direct labor= $3,500

Machine Hours= 27

Job 766:

Direct material= $8,900

Direct labor= $4,775

Machine Hours= 44

Job 765 produced 152 units, and Job 766 consisted of 250 units.

Assuming that the predetermined overhead rate is applied by using machine hours at a rate of $200 per hour.

Costs sheet:

Job 765:

Direct material= 5,670

Direct labor= 3,500

Allocated overhead= 200*27= 5,400

Total cost= 14,570

Unitary cost= 14,570/152= $95.85

Job 766:

Direct material= 8,900

Direct labor= 4,775

Allocated overhead= 200*44= 8,800

Total cost= 22,475

Unitary cost= 22,475/250= $89.9