The volume of the mold is 186 cubic feet concrete is sold by cubic yard how many cubic yards of concrete will I need to fill mold

User Carma
by
4.0k points

1 Answer

3 votes

Answer:

Volume of the mold is
6.93\ \text{yards}^3.

Explanation:

The volume of the mold is 186 cubic feet concrete. It is to be sold by cubic yard. It means that we need to convert cubic feet to cubic yard.

1 feet = 0.334 yards


186\ \text{feet}^3=186* (0.334\ \text{yards})^3\\\\V=6.93\ \text{yards}^3

So, the volume of the mold is
6.93\ \text{yards}^3.