116k views
5 votes
The basin beneath a

fountain is a right circular
cone that is 7 m across
and 1 m deep at the
center. After the fountain
is cleaned, the pool is
refilled at a rate of
300 L/min.
One cubic meter is 1,000 L
How long does it take to
refill the
pool? Round to the
nearest whole number as
needed.

User LukeP
by
8.8k points

2 Answers

5 votes

Answer: 43 minutes

Step-by-step explanation: I don't know how to get the answer but I had te same problem and that was the answer

User Dpndra
by
8.4k points
6 votes

Answer:

It will take 171 minutes to refill the pool

Explanation:

Diameter of cone = 7 m

Radius of cone = 7 m

Depth of cone = 1 m

Volume of cone =
(1)/(3) \pi r^2 h = (1)/(3) * (22)/(7) * 7^2 * 1=51.33 m^3

1 cubic m = 1000 L

51.33 cubic m =
51.33 * 1000 =51330 L

Time taken to fill 300 L = 1 min

Time taken to fill 51330 L =
(51330)/(300)=171.1

So, it will take 171 minutes to refill the pool

Hence it will take 171 minutes to refill the pool

User WebbySmart
by
7.8k points
Welcome to QAmmunity.org, where you can ask questions and receive answers from other members of our community.

9.4m questions

12.2m answers

Categories