Answer:
$2, 000.
Step-by-step explanation:
Okay, we are given the following data or parameters or infomation which are goin to help us in solving the question above.
So, we are given that; (1). ''Toy A requires 0.25 hours of assembly and 0.1 hours of packing for each toy while Toy B requires 0.20 hours of assembly and 0.15 hours of packing for each toy.
(2). "The maximum assembly hours is 200 and the maximum packing hours is 100. "
(3). ''Toy A sells for $3 and Toy B sells for $5. Total costs for Toy A is $1 and total costs for Toy B is $2.''
(4). "The maximum number of Toy A is 500 and Toy B is 400."
Therefore; let us delve right into the solution to the question.
Assuming a and b are the numbers of toys produced;
0.25a + 0.20 b < 200. ---------------------(1).
0.1a + 0.15b < 100. --------------------------(2).
Remember that a = 500 and b = 400.
Also, there is the need for maximizing 2a + 3b.
Using excel solver, we will get;
a = 400 and b = 400.
Thus, 2a + 3b. = (2× 400) + (3× 400).
=> $2000