Answer:
(a). 0.6
(b). 60%
(c). 100.
(d). 35.
Step-by-step explanation:
(a). The safety factor (α) of the current operation can be calculated by using the formula below;
V = j(h + l )(1+ b )/ w.
Where V = number of Kanban cards = 2, j = the using work center can handle daily = 250, l= The average elapsed time for the entire cycle = 0.25, h = processing time , b = policy variable and w = capacity.
Then, 250 × 0.25 × (1 + b)/ (50) = 2.
b =0.6.
(b). The efficiency rating of the current operation is;
250 (0.25) (1 + b ) /50 = 2
=> 1.25 (1 + b ) = 2
1+b = 2/1.25 = 1.6.
b = 1.6 - 1 = 0.6.
= 60%.
(c). If the company decides to use only one container, it must hold;
250 (0.25) (1.6) /b = 1.
b = 250 (0.25) (1.6).
= 100 parts.
(d). 250 (0.25) (1.12)/ b = 2.
2b = 250 (0.25) (1.12) = 70.
b= 70/2 = 35 parts.