138k views
5 votes
Currently, the lost time of each stage is 4 seconds, and intersection critical v/c ratio is set to be 0.75 to avoid cycle failures caused by randomness of arrival traffic. Solve the following problems: 1) identify critical lane groups and solve their sum of flow ratios; 2) minimum cycle length and optimal cycle length; 3) Autonomous vehicle technologies make traffic movement at intersections more efficient. The lost time of each stage is reduced to 2 seconds, saturation headway is reduced by 10%. If the intersection demand does not change, calculate the critical v/c ratio corresponding to the minimum cycle length in 2).

User Kez
by
3.9k points

1 Answer

5 votes

Find the solution in the attachments

Note: Question was incomplete, so the complete question is added in the attachments.

Currently, the lost time of each stage is 4 seconds, and intersection critical v/c-example-1
Currently, the lost time of each stage is 4 seconds, and intersection critical v/c-example-2
Currently, the lost time of each stage is 4 seconds, and intersection critical v/c-example-3
Currently, the lost time of each stage is 4 seconds, and intersection critical v/c-example-4
User GJohannes
by
3.3k points