Answer:
Total cost= $8,966
Step-by-step explanation:
Giving the following information:
Direct materials $3,991
Direct labor-hours 85 labor-hours
Direct labor wage rate $13 per labor-hour
Machine-hours 129 machine-hours
The predetermined overhead rate is $30 per machine-hour.
The total cost is calculated as follow:
Total cost= direct material + direct labor + allocated overhead
Total cost= 3,991 + (85*13) + (129*30)
Total cost= $8,966